MC04-BR02bridge is a two span continue beam with total length L=110.00m. Deck superstructure composes of as a cast-in-situ prestressed concrete multi-cellular box girder supported on reinforced concrete pier at the intermediate support and abutments walls at the end supports.
The design has incorporated the irregular shape of the deck considering the following:
Structural design has been carried out based on British Standard BS 5400 and the ASHGHAL Specifications for structures in Qatar.
AUTOCAD MODEL
FIRST STAGE SUBSTRUCTURE
SECOND STAGE CAST IN SITU PRESTRESSED DECK
ABUTMENT